Hwy 3 Copper Creek Washout
Location
Copper Creek
Client
Ministry of Transportation and Transit
Category
Project Overview
This project involves the removal and replacement of retaining wall structures along Highway 3, approximately 40 kilometres south of Princeton.
The scope includes construction of two cast-in-place concrete retaining walls and removal of the existing walls, along with remediation of embankments, shoulders, barriers, and drainage channels. Work also includes installation of spillways and riprap, culvert replacement, and reconstruction of the roadway structure.
Granular materials and asphalt are being supplied, placed, and compacted to restore the highway surface, followed by installation of signs and pavement markings. Final revegetation and seeding will complete the corridor restoration.